Dumpster for New Construction
Most new construction debris jobs need a 30 yard dumpster, which runs a median of $520. Expect 2 to 4 tons of debris.
How much it weighs
Framing offcuts, packaging, drywall scrap and siding are bulky and moderately heavy. Most builds run a 30 or 40-yard and swap it several times.
What to watch for
Ask about swap pricing rather than per-rental. On a multi-month build, a scheduled swap rate is usually cheaper than repeated one-off rentals.
Will it go over the weight allowance?
Very likely, and this is the number that decides your bill. A 30 yard typically includes 2 tons. This job runs 2 to 4 tons, so you should expect to be 2 tons over. At a median $76 a ton that is roughly $0 to $152 on top, against a median rental of $520.
That is not a reason to book a bigger container. Volume and weight are priced separately, and a 30 yard that is half full by volume can still be over on weight. The move is to tell the yard what the debris really is before they quote, so the allowance is set for the job rather than for the box.
What goes in
framing offcuts, drywall scrap, siding and packaging, roofing waste.
What does not: paint, solvents, tyres, batteries, appliances containing refrigerant, and anything with a fuel tank. Most yards surcharge mattresses and some refuse them outright. Ask for the prohibited list when you book rather than discovering it on collection day, because a load that has to be sorted at the gate is billed for the sorting.
Is the 30 yard the right call?
A 30 yard is 22′ × 8′ × 6′, roughly 9 pickup loads. If you are between sizes, the 40 yard gives you 12 loads instead. The step up costs about $80 more at the median. Going up a size buys volume, not weight allowance, so it is the right move when you are running out of room and the wrong one when you are running out of tons.
Other jobs like this one
- Whole-House Cleanout 30 yd
- Estate Cleanout 30 yd
Everything about the 30 yard · every project we cover · how to avoid overage charges
Questions
- What size dumpster do I need for a new construction debris?
- A 30 yard dumpster handles most new construction debris jobs, 22′ × 8′ × 6′, about 9 pickup truck loads.
- How much does a dumpster for a new construction debris cost?
- A 30 yard runs a median of $520, with most companies between $445 and $600. Weight over the included allowance is extra, typically $76 per ton.
- How much does new construction debris debris weigh?
- 2 to 4 tons. Framing offcuts, packaging, drywall scrap and siding are bulky and moderately heavy. Most builds run a 30 or 40-yard and swap it several times.
- What can I put in it?
- Typically framing offcuts, drywall scrap, siding and packaging, roofing waste. Ask about swap pricing rather than per-rental. On a multi-month build, a scheduled swap rate is usually cheaper than repeated one-off rentals.
More on the 30 yard · Other projects · Find companies near you