DumpsterPriceIndex

Construction Dumpster Rental

A 30-yard is the size these jobs land on, a median of $520, typically $445 to $600.

What each size costs, construction dumpster
Size MedianSample
40 yard $600 264 companies
30 yard $520 592 companies
20 yard $419 1075 companies

Where a 30-yard costs most and least

30-yard median, most expensive and cheapest of 29 states
State MedianSample
New Jersey $725 22 companies
Massachusetts $699 9 companies
New York $650 14 companies
Arkansas $650 9 companies
Colorado $450 19 companies
Georgia $450 23 companies
Arizona $445 11 companies
Utah $375 15 companies

A $350 difference for an identical container, which is why a national average is close to useless for budgeting.

What the price includes

Typically included before extras start
Included MedianSample
Rental period 7 days, median
Weight allowance 2 tons, median
What is charged past that
Charged on top MedianSample
Per extra ton $76 845 companies
Per extra day $16 876 companies

Those two lines are where a bill diverges from a quote. Put your own numbers in the calculator, or see everything that lands on an invoice.

Find companies near you

Independently owned, ranked by Index Score, showing the prices they publish themselves.

Search the directory · Prices by state

What a construction dumpster is

The larger containers, taken by builders and contractors for demolition debris, framing offcuts, drywall, roofing and fit-out waste.

Who rents one

General contractors, roofers, remodellers and demolition crews, and anyone else generating waste faster than a skip-sized container can absorb.

The thing that catches people out

Weight, not volume, is what catches construction jobs out. A 30-yard of framing lumber is well inside its allowance; the same container half full of plaster, tile or shingles is not. Tell the hauler what is going in before they quote.

How it differs from the others

A residential container is smaller and cheaper but will not survive a tear-off. Where the debris is masonry or concrete, a 10-yard filled partway is the right answer and a 40-yard is refused.

Choosing the size

On a construction job the container is sized around the debris stream, and the streams behave very differently. Framing offcuts, siding, insulation and packaging are bulky and light, so a 30 or 40 yard fills up long before the weight allowance matters. Roofing is dense enough that a 20 yard is usually the ceiling. Concrete, block and soil go in a 10 yard filled partway, because a full one is already at the truck's legal lift limit.

Separating the streams is worth real money on a job of any size. A container of clean concrete or clean fill often gets a lower flat rate because the material is recycled rather than landfilled, and one wheelbarrow of mixed trash tipped into it removes that rate for the whole load.

What moves the price

Weight is what decides a construction invoice, and it is the number most jobs underestimate. A tear-off at 25 squares of architectural shingle is roughly five tons before underlayment, which is well past a standard allowance on its own. Plaster, tile and old subfloor are all heavier than they look stacked.

The other cost is downtime. A crew standing around waiting for a swap-out is more expensive than the haul, so on anything running more than a few days it is worth agreeing the swap schedule when you book rather than calling when the container is already full. Haulers can usually commit to a next-day swap if they know it is coming. The overage guide covers the weight side.

Common questions

What size dumpster for a construction site?
A 30 yard is the general-purpose answer for framing, siding and fit-out debris, and a 40 yard where the material is bulky and light. Roofing tear-offs sit at 20 or below because shingles are dense. Anything masonry goes in a 10 yard part filled, since a full one exceeds what a roll-off truck can legally lift.
How many tons does a construction dumpster include?
Allowances are set per rental rather than per size, and dedicated construction rentals are often quoted with a higher allowance and a per-ton rate above it. Get both numbers plus the swap-out cost before you book, because on a job of any length the overage and the swaps will exceed the base rate.
Can I have more than one dumpster on site?
Yes, and on jobs producing more than one type of debris it is usually cheaper. One container for clean concrete or clean fill at the recycling rate and one for everything else beats a single mixed load, because mixing removes the cheaper disposal route for the entire container.

Related